Skip to content
A.Pietig Pickleball

Backyard pickleball courts in Eagan

A. Pietig Concrete, based in Bloomington, builds backyard pickleball courts, and Eagan is one of the towns it serves. This page covers the city rules that shape a backyard court, including zoning permits, setbacks, fences, grading permits, shoreland limits and watershed permits.

Get a court quote

Updated

What Eagan's rules say

  • Eagan requires a Zoning Permit before you build a patio, sport court or tennis court. The permit helps make sure the work meets city code rules such as setbacks, hard surface coverage and structure height. Retaining walls under 4 feet tall also need a Zoning Permit. Walls 4 feet and taller, measured from the bottom of the foundation course, need a building permit. You apply through the city's online permit portal with a site plan.

    Source: City of Eagan, Zoning Permits (opens in a new tab)

  • In the R-1 and R-2 zoning districts, Eagan's handout on accessory buildings lists setbacks of 5 feet for side and rear yards and 30 feet for the front yard or a public right-of-way. In the E district, side and rear yards are 10 feet, and the front is also 30 feet. Except for an attached garage, no accessory building or structure may go in the front yard, and structures are not allowed in easements. The handout doesn't name sport courts, so ask the city how these setbacks apply to yours.

    Source: City of Eagan, Accessory Buildings and Garages handout (opens in a new tab)

  • A residential fence needs a Zoning Permit. A fence can be up to 6 feet tall in side and rear yards and 42 inches tall in front yards. On a corner lot, no structure or planting more than 30 inches above the curb can sit in a triangle that runs 30 feet along each curb from the intersection. Every part of a fence, footings included, must be inside your property line. Ask the city how the height limit applies to court fencing.

    Source: City of Eagan, Fences (opens in a new tab)

  • A city Grading/Excavation Permit is needed for work that disturbs 10,000 square feet or more, or that needs excavation or fill 5 feet deep or more. It isn't required for work covered by a building permit or a development contract. Construction projects listed in Sec. 4.34-B of the city's stormwater rules need a Stormwater Management Permit, so ask the city whether your project is one.

    Source: City of Eagan, Public Works Permits & Petitions (City Code Secs. 4.30 and 4.34) (opens in a new tab)

  • Some Eagan properties are in a Shoreland Overlay District. On those lots, impervious surface can cover no more than 25% of the entire parcel. The city counts any hardcover that doesn't let water soak into the soil as impervious. Ask the Planning Department whether your lot is in a Shoreland Overlay District.

    Source: City of Eagan, Driveway Replacement / Expansions handout (opens in a new tab)

  • Is your lot in the Eagan-Inver Grove Heights Watershed Management Organization? It currently has no rules, regulations or permit requirements of its own. It says to contact the city to make sure ordinances are met and proper permits are granted. Depending on the project and location, the Minnesota DNR or the Minnesota Pollution Control Agency may require permits too.

    Source: Eagan-Inver Grove Heights Watershed Management Organization, Permitting (opens in a new tab)

Rules change. Check with the city before you build. We help with the permit.

Pickleball in Eagan

Eagan has dedicated outdoor pickleball courts at three parks: eight at Quarry Park, nine at Rahn Park and four at Sky Hill Park. Outdoor leagues run at Rahn Park from late April to early October, and the Eagan Community Center offers open pickleball.

Source: cityofeagan.com (opens in a new tab)

Planning a court in Eagan? Contact A. Pietig Concrete for a quote.

More about pickleball courts

Get a court quote

Tell us where the court would go and what kind you have in mind.

D!nky's owner, Andy Pietig, also owns A.Pietig Concrete, the company that builds the courts.

apietigconcrete.com (opens in a new tab)