Backyard pickleball courts in Minneapolis
A. Pietig Concrete, based in Bloomington, builds backyard pickleball courts, and Minneapolis is one of the cities it serves. This page covers what the city's rules say about permits, setbacks, fences, hard surface limits and soil work, plus where to find public courts.
Updated
What Minneapolis rules say
The city's handout says patios, driveways and sidewalks at homes generally need no building permit, but they do need zoning review and approval. All fences need zoning approval too, and a fence over 7 feet tall also needs a building permit.
Source: Minneapolis handout: Fences, driveways, patios and similar site features (opens in a new tab)
The zoning code doesn't name pickleball courts. It allows swimming pools and other recreational facilities as accessory uses. Accessory uses and structures must meet at least the same yard setbacks as the house, unless another part of the zoning code says otherwise.
Source: Minneapolis Zoning Code 545.370 and 545.610 (opens in a new tab)
No fence can be taller than 8 feet anywhere on the lot. Lower limits apply in the setback areas along your lot lines. Along the rear lot line, for example, the limit is 6 feet.
Source: Minneapolis Zoning Code 550.1550 (opens in a new tab)
The city caps how much of a lot can be hard surface. Its handout lists 60% of the lot in the Interior 1, Interior 2 and Parks built form districts, and 75% in Interior 3 and Corridor 3. The cap counts all structures, driveways, walkways, steps, decks and porches. It generally counts everything other than grass and landscaping, so a concrete court counts too.
Source: Minneapolis accessory structures handout (Zoning Code 540.920) (opens in a new tab)
If your project will disturb more than 500 square feet of soil (5 cubic yards), you need an erosion control permit. Past 5,000 square feet (500 cubic yards), you also need an erosion control plan approved by Public Works.
Source: City of Minneapolis: Soil Erosion Permits (opens in a new tab)
Shoreland rules cover land within 1,000 feet of a protected lake, pond or wetland, like Bde Maka Ska, Lake Harriet or Lake Nokomis. They also cover land within 300 feet of a protected river or stream, like Minnehaha Creek or the Mississippi River. There, grading or filling over 10 cubic yards on land that slopes toward the water needs an erosion control plan approved by the city engineer and the zoning administrator.
Source: Minneapolis Zoning Code 535.1210 and 535.1280 (Shoreland Overlay District) (opens in a new tab)
Rules change. Check with the city before you build. We help with the permit.
Pickleball in Minneapolis
The Minneapolis Park and Recreation Board lists dedicated pickleball courts at Dickman Park, Lake Nokomis Park and Loring Park. Other parks, like Folwell, Kenny and Pearl, have pickleball lines on their tennis courts.
Planning a court in Minneapolis? Contact A. Pietig Concrete for a quote.