Backyard pickleball courts in Orono
A. Pietig Concrete, based in Bloomington, builds backyard pickleball courts, and Orono is one of the towns it serves. This page covers the city rules that shape a backyard court, including setbacks, lake lots, hardcover limits, fences, permits and watershed rules.
Updated
What Orono's rules say
Orono treats sport courts, pickleball courts included, as accessory structures that need a permit. The city doesn't require a fence around a court. A court can't go in a drainage, utility or similar easement. It must meet the accessory structure setbacks for your zoning district. In the residential districts on the city's chart, those run from 15 to 50 feet from the front lot line and from 10 to 20 feet from interior side and rear lot lines. On a lake lot, the rear setback applies to the lot line opposite the lake. A court must also sit at least 25 feet from a wetland edge, 20 feet from a septic drainfield and 10 feet from other parts of a septic system.
Source: City of Orono, Residential Accessory Structures information sheet (opens in a new tab)
On a lake lot, a court must also sit back from the ordinary high water level. That setback is 75 feet on Lake Minnetonka and Forest Lake. On Long, Mooney and Tanager lakes, it's 75 feet for lots on sewer and 100 feet for lots with septic. On lakes like Classen, Dickey and Lydiard, it's 150 feet. A court can sit lakeward of the average lakeshore setback, a straight line between the most lakeward points of the homes on the lots next door, only if its total height is less than 42 inches above the existing grade.
Source: City of Orono, Residential Accessory Structures information sheet (opens in a new tab)
City code defines hardcover to include sport and tennis courts, and Orono counts porous or pervious pavement as hardcover too. Lots in the Stormwater Quality Overlay District, shown on the city's tier map, have a hardcover limit set by their tier: 25% of the gross lot area in Tier 1, 30% in Tier 2, 35% in Tier 3 and 50% in Tier 4, which covers lots zoned RPUD. Other than improvements the Shoreland Overlay District allows, no hardcover can go within 75 feet of the ordinary high water level of any lake or tributary, or in any bluff or shore impact zone.
Source: City of Orono, Hardcover Information Packet (opens in a new tab)
Most fences need no permit, but they must meet height and location rules. In a required yard along a street, the usual limit is 42 inches, but a fence along a county road or state highway can be up to 6 feet. Along an interior side lot line, or a rear lot line that isn't on a street, the limit is 6 feet. Contact city staff about any fence taller than 6 feet. On a lake lot, no fence can go within the lakeshore setback. That is 75 feet from the ordinary high water level of Lake Minnetonka or Forest Lake, 100 feet on Long, Mooney or Tanager Lake, and 150 feet on lakes like Classen and Lydiard.
Source: City of Orono, Fence Regulations: Lakeshore Properties (opens in a new tab)
A court needs a city zoning permit, which you apply for through Orono's online permit portal. You'll need a site plan showing the court's location and the existing and proposed grades. Lots in the Stormwater Quality Overlay District, typically within 1,000 feet of a lake or 300 feet of certain creeks, also need hardcover calculations. The application needs documentation from the Minnehaha Creek Watershed District about its permit requirements, and the city won't issue a permit without it.
Source: City of Orono, Residential Accessory Structures information sheet (opens in a new tab)
Under the Minnehaha Creek Watershed District's erosion control rule, disturbing 5,000 square feet or more of land needs a permit. A job under one acre that isn't part of a larger plan of development or sale of one acre or more, and that needs no other district permit, can use its General Permit. That means filing a notice and a simple erosion control plan online before work starts. If the portal flags a regulated waterbody or floodplain on the lot, the General Permit takes effect only once district staff confirm no other district permit is needed. Digging, filling or stockpiling 50 cubic yards or more of soil that isn't enclosed from rain and runoff also falls under the General Permit.
Source: Minnehaha Creek Watershed District, Erosion and Sediment Control Rule (opens in a new tab)
Rules change. Check with the city before you build. We help with the permit.
Planning a court in Orono? Contact A. Pietig Concrete for a quote.