Backyard pickleball courts in St. Louis Park
A. Pietig Concrete, based in Bloomington, builds backyard pickleball courts, and St. Louis Park is one of the towns it serves. This page covers the city rules that shape a backyard court, including permits, setbacks, fences, lot coverage, erosion control and lighting.
Updated
What St. Louis Park's rules say
The zoning code defines a sport court as a hard or paved surface with sports equipment like nets or goals. Its main use is playing sports such as tennis or basketball. A patio, porch, pool or driveway doesn't count as one.
Source: St. Louis Park Zoning Code Sec. 36-485 (effective Aug. 28, 2026) (opens in a new tab)
You need a city permit before a sport court goes in, and the court must be anchored in a way the city approves. It has to sit behind the front face of the house and at least 5 feet from the rear lot line. It must also meet the same side yard setbacks as the house. Any part of the court within 25 feet of the rear lot line must be screened by a 6-foot privacy fence.
Source: St. Louis Park Zoning Code Secs. 36-306 and 36-327 (effective Aug. 28, 2026) (opens in a new tab)
Every new fence needs a city permit and one inspection after the post holes are dug. Fences can be up to 6 feet tall in side and back yards and 4 feet in front yards. Side and back yard fences next to state highways, schools, religious institutions, railroads, or commercial or industrial property can reach 8 feet. Anything over 6 feet needs an engineer's approval and a building permit instead of a fence permit.
Source: St. Louis Park Building a Fence handout (opens in a new tab)
In the N-1 and N-2 zones, hard surfaces can cover no more than 60 percent of a single-family lot. That includes buildings, driveways, sidewalks and decks. Ask the city how your court counts toward that limit.
Source: St. Louis Park Zoning Code Table 36-79(b) (effective Aug. 28, 2026) (opens in a new tab)
You need a city erosion and sediment control permit if the work disturbs 5,000 square feet or more, or if it digs out 50 cubic yards of soil or more. Stockpiling soil or other materials, or tearing down a structure, also calls for one. So does disturbing land within 100 feet of a lake, pond or wetland. City staff can tell you if your project needs one.
Source: St. Louis Park Erosion and Sediment Control Permit page (opens in a new tab)
Outdoor lights can't put more than 0.5 footcandle of spill light or glare on a neighboring home's property line. Flickering or flashing lights aren't allowed, and the city may limit the hours lights are on. Outdoor recreation facilities with lighted courts or fields follow separate rules, including no lights from 11 p.m. to 7 a.m. The code doesn't say whether a backyard court counts, so ask the city before you add lights.
Source: St. Louis Park Zoning Code Secs. 36-401 and 36-403 (effective Aug. 28, 2026) (opens in a new tab)
Rules change. Check with the city before you build. We help with the permit.
Pickleball in St. Louis Park
Wolfe Park has five pickleball courts and Bass Lake Preserve has two. The city rents them out from April through October, and when they aren't rented, play is first-come, first-served.
Planning a court in St. Louis Park? Contact A. Pietig Concrete for a quote.